Work Orders can be created in Jiwa without using an existing Bill of Materials. This may be required where the production requirement is one-off, the components are not set up as a standard Bill, or the user needs to manually enter the items and quantities required for the build.
This article explains how to create a Work Order without a Bill of Materials and manually enter the production details required to manufacture the finished item or component.
Creating Work Order
From the menu select Manufacturing | Work Order
From the menu ribbon select New Work Order
Header Information
In the General section give your work order;
-
Reference,
-
Production Qty,
-
Set the planned and required production dates, and
-
Set the status
Because we will not be creating this Work Order using a Bill of Material the Bill No. field is left blank.
Details Tab
Stages
Add a stage to your Work Order Input and output items cannot be added to the Work Order until at least 1 stage has been setup
Inputs
Components
Add the input components to your Work Order making sure you enter in the Unit Quantity
The Unit Quantity is used to calculate the Total Quantity (Unit Quantity x Production Qty)
Instructions
Add instructions to your work order if required
Outputs
Add the output item or items to your Work Order making sure you enter in the Unit Quantity
The Unit Quantity is used to calculate the Total Quantity (Unit Quantity x Production Qty)
Where there is more than 1 output item ensure that the cost percentage field is updated against each line.
Select Save from the menu ribbon to create your new Work Order.
Note: If the total cost percentage does not add back to 100% when you attempt to enter the Quantity Output the following error message will be displayed
Reporting
To print out the Work Order report from the menu ribbon select Print | Work Order